--- title: "Scenario 3: Deployment of fiber SFP NIC with  Trellix DLP 8800" slug: "scenario-3-deployment-of-fiber-sfp-nic-with-trellix-dlp-8800" tags: ["DLPNP 11.10.x", "Hardware"] updated: 2026-11-04T16:59:10Z published: 2026-11-04T16:59:10Z canonical: "docs.trellix.com/scenario-3-deployment-of-fiber-sfp-nic-with-trellix-dlp-8800" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.trellix.com/llms.txt > Use this file to discover all available pages before exploring further. # Scenario 3: Deployment of fiber SFP NIC with  Trellix DLP 8800 This section guides you through the sequential steps to physically install and provision the DLP 8800 hardware appliance. 1. Before you start to set up the hardware, read these topics: - FCC compliance - Safety compliance guidelines - Rack-mounting considerations - Check your shipment 2. Install the fiber SFP NIC inside Trellix DLP 8800 appliance If you have already installed the RAID battery backup unit, displace the backup unit to some other location in the appliance or place it as [shown](https://docs.trellix.com/data-and-email/docs/setting-up-fiber-sfp-nic-for-use-with-trellix-dlp-8800-appliance-2) after installing the SFP NIC. 3. Connect a monitor, keyboard, and mouse to the appliance. 4. Connect the power supply cables of the appliance to its respective power supply source.