Remove a Trellix SIEM appliance and install a new one.
Back up the appliance.
Remove the old appliance.
Turn off the power.
Note where the cables are connected so you can connect them to the new appliance.
Disconnect the cables and the power cord.
Remove the chassis from the rack.
Install the new appliance.
Place the chassis in the rack.
Note
For some types of rails, you might need to remove a stud from the side of the chassis.
Connect the cables and power cord in the same configuration as the old appliance.
Turn on the power.
Restore the backup.
Roll out policy ( →
)..png)
Sync alarms ( → → → ).