Before you begin
Perform the following steps to install Active Fail-Open modules 18 and 19 in the 100G Active Fail-Open chassis (model 20). You can install up to two Active Fail-Open modules in a single chassis.
Task
- Place the 1U chassis against the front of a standard 19-inch rack.
- Slide the 100G Active Fail-Open module into one of the two slots in the chassis, until the faceplate of the module rests against the chassis.
- Secure the module to the chassis by inserting screws provided through the holes on the Active Fail-Open module faceplate and into the panel.
-
(Optional) Install up to two 100G Active Fail-Open modules by following these steps:
- Remove screws holding each of the removable blank plates from the front of the chassis.
- Perform steps 2 and 3 for installing another module in the chassis.