--- title: "1. Install the fail-open switch" slug: "1-install-the-fail-open-switch-2" tags: ["Product Usage", "IPS 11.1.x"] updated: 2026-11-19T12:29:31Z published: 2026-11-19T12:29:31Z canonical: "docs.trellix.com/1-install-the-fail-open-switch-2" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.trellix.com/llms.txt > Use this file to discover all available pages before exploring further. # 1. Install the fail-open switch **Prerequisite:** Depending on whether you can physically connect the fail-open switch to a computer using an RS232 cable, you might consider swapping this step with configuring fail-open switch parameters. These steps explain the procedure to install fail-open switch model 1. 1. Slide the switch into the opening in the center of the rack-mount panel, until the faceplate of the switch rests against the panel. **Slide the fail-open switch into the rack plate**![Slide the fail-open switch into the rack plate](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/uuid-4df784b4-9bb8-7853-56c3-7d7ce73e9b9a(8).png?sv=2026-02-06&spr=https&st=2026-11-20T13%3A06%3A42Z&se=2026-11-20T14%3A06%3A42Z&sr=c&sp=r&sig=Q60aZTeLvbbXJeKtfaeLaCLcHaJbAit1HRusXwZIQAQ%3D) 2. Secure the switch to the rack-mount panel by inserting screws through the holes on the switch faceplate and into the panel. 3. Install the panel and fail-open switch on the rack. 1. Place the 1U panel against the front of a standard 19-inch rack. 2. Secure the rack-mount panel by inserting the screws (included with the rack-mount panel) through the holes on the front of the panel and the sides of the rack. 4. Additional fail-open switches can be installed without removing the rack-mount panel from the rack. To install up to two additional switches: 1. Remove the screws holding one of the removable blank plates from the front of the panel. 2. Follow the procedure for installing a switch in the rack-mount panel for the additional fail-open switch.