--- title: "Considerations for failover in stacked Sensors" slug: "considerations-for-failover-in-stacked-sensors" tags: ["Hardware", "IPS 11.1.x"] updated: 2026-09-17T09:43:41Z published: 2026-09-17T09:43:41Z canonical: "docs.trellix.com/considerations-for-failover-in-stacked-sensors" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.trellix.com/llms.txt > Use this file to discover all available pages before exploring further. # Considerations for failover in stacked Sensors While configuring failover for a stack, you need to take the following factors into consideration: - Both the stacks must be identical to each other with identical connections, network modules, and capacity. - Ensure you have the correct license to configure failover for a stack. The licenses required are as follows: | Capacity | No of Sensors | Number of License SKUs | | --- | --- | --- | | 40 Gbps | 2 * 2 NS9500 Sensors | FO95X40CAE-AT | | 60 Gbps | 2 * 2 NS9500 Sensors | FO95X60CAE-AT | | 100 Gbps | 2 * 4 NS9500 Sensors | FO95X100CAE-AT | - You can use 2-port QSFP28 interface module, or 2-port QSFP+ interface module or 4-port QSFP+ interface module for Sensor failover. - Port G1/1 is used for failover. G1/2 is unusable. For 4-port interface module, ports G1/3 and G1/4 can be used as monitoring ports. - You need to purchase separate Direct Attach Copper (DAC) cables for failover. - The supported DAC cable length for the failover is 3 meters. It is recommended that the stack configuration is installed within one rack. If the stack is configured in multiple racks, you will need to use the QSFP+ SR fiber transceiver modules. > [!NOTE] > Note > > In the event of node failure in a stack, the remaining nodes will continue to function and a fault is generated in the **System Faults** page in the Manager.