--- title: "Deployment scenario" slug: "deployment-scenario" tags: ["Product Usage", "IPS 10.1.10"] updated: 2026-09-06T12:28:34Z published: 2026-10-05T15:41:20Z canonical: "docs.trellix.com/deployment-scenario" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.trellix.com/llms.txt > Use this file to discover all available pages before exploring further. # Deployment scenario Since we have looked at the steps to set up a fail-open switch and deploy it, we’ll go through a scenario to see how the setup works. We will cover configuration steps at a high level without listing each step. For more detailed steps on any section, refer to sections above. The deployment uses the following software and hardware equipment: - 10G 50 µm optical active fail-open switch with SNMP (This switch requires two power adapters and two XFPs that support an LC Fiber cable). - M-3050 Sensor, with two 10G XFPs, that has one of its port pairs deployed inline fail-open. - Windows Server 2008 or 2012 computer installed with iReasoning MIB browser. - Cables for connecting the various devices. - Terminal emulation software such as HyperTerminal or PuTTy. We will be using PuTTy for this deployment. - Make note of these parameters that you will while setting up fail-open switch parameters. - Baud rate: 19200 bits per second - Data bits: 8 - No parity - Stop bits: 1 - No flow control - Username and password: Trellix - Fail-open switch MIBs to decode SNMP traps from a 10G active fail-open switch. If you do not have MIBs with you, contact Technical Support.