--- title: "Shut down the Manager/Central Manager services" slug: "shut-down-the-manager-central-manager-services-2" tags: ["Install and Get Started", "IPS 11.1.x"] updated: 2026-11-19T12:54:23Z published: 2026-11-19T12:54:23Z canonical: "docs.trellix.com/shut-down-the-manager-central-manager-services-2" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.trellix.com/llms.txt > Use this file to discover all available pages before exploring further. # Shut down the Manager/Central Manager services A proper shutdown of the Manager/Central Manager prevents data corruption by allowing data transfer and other processes to gracefully end prior to machine shutdown. **Shutting down the Manager** A proper shutdown of the Manager services requires the following steps be performed: **Steps:** 1. Close all client connections. See [Closing all client connections](/network-and-platform/docs/close-all-the-client-connections-2). 2. Stop the Trellix IPS Manager service. 3. Stop the Trellix IPS Manager Watchdog service. 4. Stop the Trellix IPS Manager database service.