--- title: "VX 12550 Hardware Administration Guide" slug: "vx-12550-hardware-administration-guide-1" updated: 2026-09-11T20:18:56Z published: 2026-09-11T20:18:56Z canonical: "docs.trellix.com/vx-12550-hardware-administration-guide-1" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.trellix.com/llms.txt > Use this file to discover all available pages before exploring further. # VX 12550 Hardware Administration Guide # ER 1: The VX 12550 ![Front view of a FireEye VX 12550 rack appliance — silver front panel with FireEye logo and a visible VX 12550 label, shown low on the page](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0005_img_01.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) The FireEye VX 12550 appliance is a powerful stand-alone analysis engine that integrates with FireEye sensors to provide a flexible, scalable, and geographically expansive security solution. For information about integrating the VX Series appliance with NX Series sensors and CM Series appliances, see the Network Security Deployment Guide for your software release. --- © 2019 FireEye 4 VX Series Hardware Administration Guide CHAPTER 1: The VX 12550 --- # The Front View ![Front view of the VX 12550 appliance showing the white front panel with FireEye logo and front bezel](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0006_img_01.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) | 1) Power Button | 5) Power Fail LED | | --- | --- | | 2) Reset Button | 6) HDD LED | | 3) Power LED | 7) NIC LED | | 4) NIC LED | 8) Information LED | ## Buttons - **Power Button:** Use the power button to turn the appliance on or off. Turning off the power with this button removes the main power, but keeps the standby power supplied to the appliance. Therefore, unplug the appliance before servicing. - **Reset Button:** Use the reset button to reboot the system. ## LEDs The front panel has LEDs that provide critical information about parts of the appliance. The following table describes each LED. The Front View --- | **LED** | **Flashing** | **Steady** | **Off** | **Normal State** | | --- | --- | --- | --- | --- | | Power | N/A | Blue and steady indicates power is being supplied to the system | No power is being supplied to the system | Blue and steady | | NIC LAN 2 | Blue and flashing indicates data transfer via IPMI port | Blue and steady indicates normal connectivity on IPMI port | No activity | Blue and steady | | Power Fail | N/A | Red indicates a power supply module has failed. | System is operating normally | Off | | HDD | Flashing and blue indicates HDD activity. | N/A | HDD is idle. | Flashing and blue when in use and off when not in use. | | NIC LAN 1 | Blue and flashing indicates data transfer via ether1 port | Blue and steady indicates normal connectivity on ether1 port | No activity | Blue and steady | | Information | Red and flashing indicates a power fail. | Red and steady indicates a platform event filter initiated by the motherboard | System is operating normally | Off | --- © 2019 FireEye 6 VX Series Hardware Administration GuideCHAPTER 1: The VX 12550 --- # The Rear View ![Rear view of the VX appliance showing the back panel with numbered ports 1–14](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0008_img_01.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) | 1) Power Port | 8) pether3 (RJ45) Submission/Cluster Communication 3 Port | | --- | --- | | 2) Disabled Ports | 9) pether4 (RJ45) Submission/Cluster Communication 4 Port | | 3) ether1 (RJ45) Management 1 Port | 10) Video Port | | 4) pether2 (RJ45) Submission/Cluster Communication 2 Port | 11) pether5 (SFP+) Submission/Cluster Communication 5 Port | | 5) USB 3.0 Ports | 12) pether6 (SFP+) Submission/Cluster Communication 6 Port | | 6) IPMI | 13) pether7 (SFP+) Submission/Cluster Communication 7 Port | | 7) Serial Console Port | 14) pether8 (SFP+) Submission/Cluster Communication 8 Port | ## Power Port - **Power:** Connect your power source to this port to provide power to the appliance. The appliance comes with one redundant power supply unit for use if the primary unit fails. --- © 2019 FireEye The Rear View --- ## I/O Ports - **Serial Console:** Connect to this port to manage the appliance from your terminal. - **Video:** Connect a monitor to this port to view the appliance's command-line interface. - **USB 3.0:** These ports are USB 3.0 compliant. ## Management Ports - **ether (RJ45):** Connect your LAN to this port to enable remote access to the CLI and Web UI. The RJ45 connector is a 10/100/1000BASE-T port. - **IPMI:** Connect for access to out-of-band management functions, including power control, console redirection, and appliance health status. The connector is a 100BASE-T port. ## Submission/Cluster Ports - **pether (RJ45):** Use this port as an optional dedicated interface for communication with sensors or other MVX cluster components. The pether2 connector is a 10/100/1000BASE-T port. The pether3 and pether4 connectors are 1000/10GBASE-T ports. The pether5–pether8 connectors are SFP+ connectors, use one of the following 10GbaseCu (5m direct attach cable), 1GbaseT (SFP), 1GbaseSX/10GbaseSR (dual rate SFP+), or 1GbaseLX/10GbaseSR (dual rate SFP+). See the chapter “Performing the Initial Configuration” in the MVX Deployment Guide for your software release for more information. --- © 2019 FireEye 8 VX Series Hardware Administration Guide CHAPTER 1: The VX 12550 --- --- 9 © 2019 FireEye CHAPTER 2: Deployment --- # CHAPTER 2: Deployment This chapter describes how to deploy the VX 12550 appliance in your network. ## VX Series Deployment The VX Series appliance acts as a compute node that analyzes submissions received by NX Series sensors. In order for NX Series sensors and VX Series appliances to communicate, they must belong to the same MVX cluster and be managed by the same CM Series platform. The following figure shows how to connect your VX 12550 to your CM Series platform in a typical network topology. > ![Blue circular icon with clipboard/document symbol](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0011_img_01.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) > > All VX Series appliances in a cluster must be within the same physical location. They can be remotely located from the managing CM Series platform and the sensors in its Network Security platform. For information about additional deployments and setting up MVX clusters, see the MVX Deployment Guide for your software release. ![Dashed-box network topology diagram showing INTERNET cloud at left, firewall icon, network switch, NX Series devices connected to a CM Series platform and a VX Series appliance, and a USERS group in a dashed box on the right; arrows indicate traffic flow between components](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0011_img_02.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) ### Prerequisites Before connecting the VX 12550 appliance to your network, ensure that your CM-Series-facing switch provides 10/100/1000BASE-T Ethernet output. --- © 2019 FireEye 10 CHAPTER 2: Deployment --- ## Cabling **To connect your VX 12550 appliance to your network:** - ether1: Connect one end of an Ethernet cable to the VX 12550 appliance’s ether1 port, and connect the other end to your CM-Series-facing switch. This is the default management, submission, and cluster communication interface. - (For optional dedicated submission interface) pether2: Connect one end of an Ethernet cable to the VX 12550 appliance’s pether2 port, and connect the other end to your cluster-facing switch. - (For optional dedicated cluster interface) pether3 through pether8: Connect one end of an Ethernet cable to the VX 12550 appliance’s pether3 through pether8 ports, and connect the other end to your cluster-facing switch. For information about changing the default submission and cluster interfaces, see the chapter “Performing the Initial Configuration” in the *MVX Deployment Guide* for your software release. VX Series Hardware Administration GuideBefore You Begin --- # **CHAPTER 3: Installation** This chapter provides information about the site requirements of your installation location. ## Before You Begin Follow the steps in this section before you install the appliance. ### Before Opening the Box - Review the Packing Slip contained in the plastic slip attached to the top of the box. Ensure the shipment contains the correct appliance. - Ensure the serial number listed on the Packing Slip matches the one specified on the sticker located on one side of the box. - If there appears to be damage to the box, file a damage claim with the carrier who delivered it. ### Unpacking the Appliance Carefully remove the appliance from the box in an area away from heat, electrical noise, and electromagnetic fields. **Ensure your box contains:** - The correct appliance model - An accessory kit - Online Documents Portal Referral # Installation Site Guidelines Follow these guidelines when you select an installation site: --- © 2019 FireEye12 VX Series Hardware Administration Guide CHAPTER 3: Installation --- - Leave enough clearance in front of the rack for its door to open completely without obstruction. - Avoid environments that produce heat, electrical noise, and electromagnetic fields. - Only install the appliance in a restricted access location such as a service closet or dedicated equipment room. - Make sure the location is properly ventilated. - Make sure there is sufficient space for air flow. # Rack Precautions FireEye recommends that you mount the appliance in a standard 19-inch rack. The vertical hole spacing on the rack rails must meet standard ANSI/EIA-310-C requirements. Consider the following before installing your appliance in the rack: - Ensure the leveling jacks on the bottom of the rack are fully extended to the floor with the full weight of the rack resting on them. - In a single-rack installation, stabilizers should be attached to the rack. - In a multiple-rack installation, the racks should be coupled together to increase their stability. - Always make sure the rack is stable before extending a component from the rack. - Only extend one component from the rack at a time—extending two or more simultaneously may cause the rack to become unstable. - Ensure your rack meets the safety requirements of UL 60950-1. **STABILITY HAZARD: The rack may tip over causing serious personal injury. To prevent injury:** ![Yellow triangular stability hazard icon with exclamation mark](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0014_img_01.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) - Before extending the rack to the installation position, read the installation instructions. - Do not put any load on the slide-rail mounted equipment when the rails are extended in the installation position. - Do not leave the slide-rail mounted equipment with the rails extended in the installation position. Server Precautions --- # Server Precautions FireEye recommends reviewing the electrical and general safety precautions that came with each component you intend to install in the rack. Review the following before installing the appliance in the rack: - Determine the placement of each component in the rack. - Ensure there is a minimum clearance of six inches behind the chassis to allow for easy cable management. - Install the heaviest component at the bottom of the rack first, then move up. - Allow hot-swappable power supply units, disk drives, and transceivers to cool before handling them. - Use a regulating uninterruptible power supply to protect your components from voltage spikes, power surges, and failure during a power outage. - Keep all of the rack's doors and panels closed when you are not servicing the components. ## Rack-Mounting Precautions Consider the following safety precautions when you install the appliance in the rack: - Make sure the appliance is grounded at all times to prevent damage from electrostatic discharge. - Use an electrostatic wrist guard when handling the appliance. - At least two technicians should be involved to install the appliance safely. - FireEye recommends only individuals with rack-mounting experience should install the appliance. - Install the appliance in an environment compatible with the manufacturer's maximum recommended ambient temperature (TMRA) for each component in your rack. ## Power Requirements The VX Series 12550 appliance uses a 1000 W power supply unit with an input rating of 100-240 VAC (±10%), 10-5 A at 50-60 Hz. --- © 2019 FireEye 14 VX Series Hardware Administration GuideCHAPTER 3: Installation --- Ensure your power source has sufficient electrical overload protection. In North America, connect the rack to a power source with over-current protection that complies with UL 489. In Europe, the over-current protection must comply with IEC standards. # Ventilation Requirements Ventilation and optimal location are essential to the proper operation of the VX Series appliance. Give the unit at least six inches of space around ventilation openings so that adequate ventilation is possible. The VX Series appliance draws air through the front and expels it out the back. Note the direction of the air intake and exhaust of the other components in the rack to ensure safe ventilation of all components involved. ## Cabling Requirements The VX Series appliance ships with the following cables: - (2) 6 ft AC power cord, SVT, 60ºC, 3x18AWG (0.824mm²) - (1) 6 ft null modem DB9 female serial cable You must provide any additional cables required to connect your system to the network and other devices. Do not exceed the maximum run length of the additional cables you provide. # Rack Installation This section explains how to install your appliance in a standard 19-inch wide rack with the equipment provided. Because various rack units are available, the assembly procedure may differ slightly from the following instructions. Refer to the installation instructions that came with your rack. --- 15 © 2019 FireEye Rack Installation --- # Installing the Inner Rails on the Appliance 1. Pull the right inner rail from the outer rail until it is fully extended. ![Right inner rail partially extended from the outer rail with a large red arrow indicating the direction to pull.](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0017_img_01.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) 2. Press the rail-release lever (located between the middle and inner rails) downward and slide the inner rail out until it is separated from the other two rail segments. ![Close-up magnified view showing a finger pressing the rail-release lever downward; red circular highlight around the lever.](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0017_img_02.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) ![Full view of the rail assembly with an overlaid magnifier highlighting the rail-release lever location and a finger operating the lever.](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0017_img_02.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) 3. Align the notches of the inner rail with the tabs on the right side of the appliance. ![Inner rail positioned near the right side of the appliance showing the notches aligned with the chassis tabs.](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0017_img_03.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) 4. While firmly pressing the inner rail against the appliance, slide it in the direction of the tabs until you hear a click. --- © 2019 FireEye 16 VX Series Hardware Administration Guide CHAPTER 3: Installation --- ![Close-up of the rear of a VX Series appliance showing the inner rail area; a hand is pressing a round latch button and a large red arrow points to the latch](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0018_img_01.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) ![Zoomed crop of the inner rail latch and surrounding perforated metal, showing fingertips and a red arrow indicating the latch](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0018_img_02.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) 5. Repeat steps 1-4 for the left inner rail. 6. (Optional) Further secure the inner rails to the appliance with the screws provided (one for each rail). --- 17 © 2019 FireEye Rack Installation --- ## Installing the Outer Rails on the Rack 1. Press the black tabs of the right outer rail against the front rack column and insert the hooks at the desired height. ![Close-up of a hand inserting an outer rail hook into a rack column; visible rack unit markings 24, 23, 22 on the column](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0019_img_01.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) 2. Firmly press the rail down to lock it in place. ![Hand pressing the rail downward to engage the rail latch on the rack column; close-up showing metal rail and rack holes](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0019_img_02.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) 3. Extend the rail until it reaches the rear rack column. 4. Insert the hooks and firmly press it onto the rack. 5. Repeat steps 1-4 to install the left outer rail. © 2019 FireEye 18 --- VX Series Hardware Administration Guide CHAPTER 3: Installation --- 6. Insert and tighten the screws at the rear of the rails to further secure the rails to the rack. # Mounting the Appliance on the Rack 1. Align the appliance's inner rails with the rack's outer rails. 2. Slide the appliance halfway into the rack. ![Close-up of rack rail showing a red arrow pointing at the rail-release notch on the appliance rail](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0020_img_01.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) 3. Press the rail-release notches down on both rails and slide the appliance fully into the rack. When the appliance has been pushed completely into the rack, you should hear the locking tabs click. ![Appliance partially inserted in a server rack with a large red arrow indicating the sliding direction; inset circular close-up shows a finger pressing the rail-release notch](https://cdn.us.document360.io/0d453a50-e1da-4d4a-9409-fea7959614d8/Images/Documentation/vx-12550-hardware-administration-guide_page_0020_img_02.png?sv=2026-02-06&spr=https&st=2026-11-19T21%3A04%3A42Z&se=2026-11-19T22%3A04%3A42Z&sr=c&sp=r&sig=fVBdh%2B8M%2Bnu2kX3sIObhryYiA5YZHJG%2BPh4%2BbmTK48k%3D) 19 © 2019 FireEye Attaching Cables to the Appliance --- # Attaching Cables to the Appliance 1. Connect the VX Series appliance to one or more network devices using the cables appropriate to the deployment of your choice. 2. Connect the power cable or cables to the power port or ports on the back of the appliance. ## Turning On the Appliance Power on the appliance by pressing the power button on the ear to the left of the bezel. --- © 2019 FireEye 20 VX Series Hardware Administration Guide CHAPTER 3: Installation --- --- 21 © 2019 FireEye # CHAPTER 4: Replacements ## Return Process If you believe you have a defective part or system, you must first contact FireEye Technical Support, who will validate the claim. If the part or system is defective, Technical Support will initiate a Return Materials Authorization (RMA) and guide you through the process. For more information, visit [www.fireeye.com/legal](https://www.fireeye.com/legal). ## Removing and Replacing a Disk Drive Perform the following steps to remove and replace a disk drive: 1. Remove the bezel at the front of the appliance by sliding the release tab to the right and pulling the bezel away from the chassis. 2. Locate the disk drive carrier that contains the failed disk drive. The carrier should have a blinking amber LED. 3. Unlock the disk drive handle by sliding the blue tab to the left. 4. Push the maroon button on the right to release the latch handle. 5. Pull the handle to slide the disk drive from its slot. 6. Insert the new disk drive carrier into the available slot and push in until it clicks. ## Removing and Replacing a Power Supply Unit Perform the following steps to remove and replace a power supply unit (PSU): © 2019 FireEye VX Series Hardware Administration GuideCHAPTER 4: Replacements --- 1. At the rear of the appliance, remove the power cable from the failed PSU. 2. While gripping the handle to the left of the power port and pressing the release lever to the right of it, pull out the failed PSU. 3. Insert the replacement PSU in the open slot and slide it in until it clicks into place. 4. Attach the power cable to the new power supply. --- 23 © 2019 FireEye VX Series Hardware Administration Guide Appendix 1: System Specifications --- ## **Appendices** # Appendix 1: System Specifications The table below provides the technical specifications for the FireEye VX 12550. | **Component** | **NX 12550 Specifications** | | --- | --- | | Form Factor | 2U Rack-Mount | | Weight of Appliance | 44 lbs (20 Kg) | | Weight of Packaged Appliance | 71 lbs (32.2 Kg) | | Dimensions (W x D x H) | 39"(991mm) x 26.5 (673mm) x 11.25"(286mm) | | Enclosure | 2 RU, fits 19-inch Rack | | Management Interfaces | (1) 10/100/1000BASE-T Port | | Submission Interfaces | (2) 10GBASE-T (SFP+) Ports (1) 10/100/1000BASE-T (SFP+) Port | | Memory | 512 GB | | Drive Provided | (4) 900 GB HDD, RAID 10, 2.5", FRU | | AC Power Supply | Redundant (1+1) 1000 watt, 100 - 240 VAC 10.5 – 4.0A, 50-60 Hz IEC60320-C14 inlet, FRU | | Maximum Power Consumption | 660 W | | Operating Temperature | 0° to 40° C (32° to 104° F) | --- © 2019 FireEye 24 VX Series Hardware Administration Guide Appendices | **Component** | **NX 12550 Specifications** | | --- | --- | | Operating Humidity | 10% to 90% @ 40° C, non‑condensing | | Operating Altitude | 10,000 feet | | Non‑Operating Temperature | -30° to 70° C (-22° to 158° F) | | Non‑Operating Humidity | 10% to 95% @ 55° C, non‑condensing | | Non‑Operating Altitude | 37,000 feet | | Maximum Thermal Dissipation | 2,252 BTU/hour | 25 © 2019 FireEye Appendix 2: Product Compliance Information --- # Appendix 2: Product Compliance Information The following table lists the electromagnetic compatibility (EMC), low voltage directive (LVD), safety, and other regulatory standards met by the FireEye VX Series appliance. | EMC | LVD/Safety | Environmental | | --- | --- | --- | | FCC Part 15 Class-A, CE (Class-A), CNS 13438, CISPR 32, VCCI V-3, EN 55024, EN 55032, EN 61000, ICES-003, KN 32, KN 35 | CSA 22.2, IEC 60950, EN 60950*, UL 60950 | RoHS REACH WEEE Conflict Minerals | *All current amendments