The new docs.trellix.com features a modernized UI and AI-powered conversational search. Content is currently available in English, with additional languages launching in early November 2026. We hope you enjoy the updated experience.

Rack installation

Prev Next

These steps explain the procedure to install the rack for the Manager Appliance.

Note

For graphical representation of the rack installation, refer to the Rail Kit Installation Guide shipped with the appliance box.

  1. Identify the Right (R) and Left (L) Rail Assemblies.

  2. Extend each rail assembly to expose the stamped 'R' and 'L' identifiers.

  3. Install left rail assembly.

    Note

    Use mounting holes within the same 1U space on both front and rear rack pillars.

    The rail is securely installed when the hook and locker that extends out of the mounting hole are fully sealed and locked into place.

  4. Repeat steps 2 - 3 for right rail assembly.

    Note

    When transporting the rack with systems pre-installed, the 10-32 shipping screws must be screwed to the center hole of the rear rail bracket to prevent possible rail mounting failure.