The new docs.trellix.com features a modernized UI and AI-powered conversational search. Content is currently available in English, with additional languages launching in early November 2026. We hope you enjoy the updated experience.

Server system installation

Prev Next

Carefully install the Manager Appliance on the mounting rails.

Note

For graphical representation of the server system installation, refer to the Rail Kit Installation Guide shipped with the appliance box.

Steps:

  1. Fully extend the rails until they lock in place.

  2. Align and insert rear mounting posts of the server into rear mounting slots of both rails.

  3. Carefully rotate server down until the remaining two server mounting posts on each side of the chassis install into the mounting slots of each rail.

  4. Verify that the server lock is fully engaged and the system is fully sealed into each rail.