Begin by configuring parameters for the fail-open switch and then connecting it to an inline Sensor. This setup does not have the provision to connect an RJ45-DB9 RS232 cable to a Windows PC after it has been installed in a rack, so the parameters for the fail-open switch will first be set up.
Connect one end of the cable to RJ45 port of the fail-open switch.
Connect the other end of the cable to DB9 port of the Windows computer.
Connect the power cables to the ports at the back of the fail-open switch.
Open PuTTy and click Serial.
Enter Speed as
115200which is the baud rate for a fail-open switch.Click Open.
The fail-open switch CLI interface appears.
Use administrator credentials to log on to the fail-open switch.
You are provided access to the fail-open switch command prompt.
To set up the fail-open switch IPv4 address, type
management eth-if ip xxx.xxx.xxx.xxxand press Enter. For example,management eth-if ip 10.10.10.1.When selecting an IP address, make sure you are able to reach the SNMP server that you intend to set up.
To set up the fail-open switch subnet mask, type
management eth-if ip-mask xxx.xxx.xxx.xxxand press Enter. For example,management eth-if ip-mask 255.255.255.0.To set up the default gateway IPv4 address, type
management eth-if default-gateway xxx.xxx.xxx.xxxand press Enter. For example,management eth-if default-gateway 10.10.10.2.To set up the SNMP manager IP address, type
set manager <SNMP manager IPv4 address>and press Enter.After you have set up fail-open switch parameters, unplug the RS232 cable and power cables.
Install the fail-open switch in the rack in a way that you are able to connect it to the Sensor.
Gently insert the 100G-SR4 or 100G-LR4 module(s) into the slots in the front of the fail-open switch.
Connect the MTP/MPO Fiber cables between the fail-open switch and the Sensor if you have inserted a 100G-SR4 module. If you have inserted a 100G-LR4 module, connect the LC Fiber cables between the fail-open switch and the Sensor.
Connect an RJ-45 cable to the Management Port on the front of the fail-open switch.
Connect the power cables back to the fail-open switch.
Configure port pair G0/1-G0/2 as Inline Fail Open – Active.
Click Save.
The link lights on the fail-open switch and Sensor ports must come on to indicate that the fail-open switch has been set up.